+1 920-563-4510

Road Construction Calendar

Please be aware that road construction projects will be underway shortly in the area. Below is a list of locations and starting dates for each project.

• Hoge Road begins 8/23

• Star School Road begins 8/24

• Kunz Road begins 8/25

• Kutz Road begins 8/26

• Koshkonong Lake Road begins 8/27

• Fairway Drive begins 8/27

• Blackhawk Bluff Drive begins 8/28

• Potawatomi Trail begins 8/30